I-95 SB TR 821 over I-95 NB & I-95 SB TR 822
FairNew London County, Connecticut · 0.6 MI N of Route 12 · Structure no. 03328
- Built
- 1966
- 59 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 661 ft
- 7 main spans
- Daily traffic
- 3,700
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I-95 SB TR 821 over I-95 NB & I-95 SB TR 822 is a steel stringer/multi-beam or girder carrying I-95 SB TR 821 over I-95 NB & I-95 SB TR 822 in New London County, Connecticut. It was built in 1966, so it is 59 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,700 vehicles a day, roughly 9% of them trucks, projected to reach 5,498 by 2040. The structure is 661 ft (201.5 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 SB TR 821 over I-95 NB & I-95 SB TR 822 built?
It was built in 1966, making it 59 years old in 2025.
What condition is I-95 SB TR 821 over I-95 NB & I-95 SB TR 822 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-95 SB TR 821 over I-95 NB & I-95 SB TR 822 carry?
About 3,700 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is I-95 SB TR 821 over I-95 NB & I-95 SB TR 822?
The structure is 661 ft (201.5 m) long with a longest span of 104 ft (31.7 m) and a deck 37 ft wide.
Who owns I-95 SB TR 821 over I-95 NB & I-95 SB TR 822?
It is owned by the State Highway Agency.