US Bridges

INTERSTATE-395 over Leffingwell Road

Fair

New London County, Connecticut · 0.8 MI S of Route 82 · Structure no. 00268

Built
1958
67 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
57 ft
1 main span
Daily traffic
63,200
2023 count
Owner
State
State Highway Agency

About this bridge

INTERSTATE-395 over Leffingwell Road is a steel stringer/multi-beam or girder carrying INTERSTATE-395 over Leffingwell Road in New London County, Connecticut. It was built in 1958, so it is 67 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 63,200 vehicles a day, roughly 16% of them trucks, projected to reach 93,909 by 2043. The structure is 57 ft (17.4 m) long and 104 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesINTERSTATE-395
CrossesLeffingwell Road
Location0.8 MI S of Route 82
RouteInterstate 395
Coordinates41.49828, -72.11571
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating46.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length57 ft (17.4 m)
Longest span51 ft (15.5 m)
Deck width104 ft (31.6 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic63,200 (2023)
Projected traffic93,909 by 2043
Trucks16%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was INTERSTATE-395 over Leffingwell Road built?

It was built in 1958, making it 67 years old in 2025.

What condition is INTERSTATE-395 over Leffingwell Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does INTERSTATE-395 over Leffingwell Road carry?

About 63,200 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is INTERSTATE-395 over Leffingwell Road?

The structure is 57 ft (17.4 m) long with a longest span of 51 ft (15.5 m) and a deck 104 ft wide.

Who owns INTERSTATE-395 over Leffingwell Road?

It is owned by the State Highway Agency.