US Bridges

Davis Street over Lake Whitney

Fair

New Haven County, Connecticut · 0.2 MI E of Whitney Ave · Structure no. 06214

Built
1992
33 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
125 ft
1 main span
Daily traffic
9,355
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Davis Street over Lake Whitney is a steel stringer/multi-beam or girder carrying Davis Street over Lake Whitney in New Haven County, Connecticut. It was built in 1992, so it is 33 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,355 vehicles a day, roughly 3% of them trucks, projected to reach 13,901 by 2043. The structure is 125 ft (38.1 m) long and 71 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesDavis Street
CrossesLake Whitney
Location0.2 MI E of Whitney Ave
RouteCity Street 0
Coordinates41.3418, -72.90971
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97 US tons
Inventory rating58 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length125 ft (38.1 m)
Longest span120 ft (36.6 m)
Deck width71 ft (21.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,355 (2023)
Projected traffic13,901 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Davis Street over Lake Whitney built?

It was built in 1992, making it 33 years old in 2025.

What condition is Davis Street over Lake Whitney in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Davis Street over Lake Whitney carry?

About 9,355 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Davis Street over Lake Whitney?

The structure is 125 ft (38.1 m) long with a longest span of 120 ft (36.6 m) and a deck 71 ft wide.

Who owns Davis Street over Lake Whitney?

It is owned by the Town or Township Highway Agency.