US Bridges

Poverty Road over Pomperaug River

Fair

New Haven County, Connecticut · 0.6 MI West Int S.Main ST · Structure no. 05029

Built
1967
58 years old, rebuilt 1989
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
108 ft
1 main span
Daily traffic
4,551
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Poverty Road over Pomperaug River is a steel stringer/multi-beam or girder carrying Poverty Road over Pomperaug River in New Haven County, Connecticut. It was built in 1967 and reconstructed in 1989, so it is 58 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,551 vehicles a day, roughly 7% of them trucks, projected to reach 6,762 by 2044. The structure is 108 ft (32.9 m) long and 19 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPoverty Road
CrossesPomperaug River
Location0.6 MI West Int S.Main ST
RouteCity Street 0
Coordinates41.48114, -73.22522
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating49.6 US tons
Inventory rating38.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length108 ft (32.9 m)
Longest span73 ft (22.3 m)
Deck width19 ft (5.9 m)
Roadway width12 ft (3.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,551 (2024)
Projected traffic6,762 by 2044
Trucks7%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Poverty Road over Pomperaug River built?

It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1989.

What condition is Poverty Road over Pomperaug River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Poverty Road over Pomperaug River carry?

About 4,551 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Poverty Road over Pomperaug River?

The structure is 108 ft (32.9 m) long with a longest span of 73 ft (22.3 m) and a deck 19 ft wide.

Who owns Poverty Road over Pomperaug River?

It is owned by the Town or Township Highway Agency.