US Bridges

New Road over Mill River

Fair

New Haven County, Connecticut · 0.5 MI S of SR 453 · Structure no. 04893

Built
1935
90 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
124 ft
2 main spans
Daily traffic
1,125
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

New Road over Mill River is a steel stringer/multi-beam or girder carrying New Road over Mill River in New Haven County, Connecticut. It was built in 1935, so it is 90 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,125 vehicles a day, roughly 2% of them trucks, projected to reach 1,672 by 2043. The structure is 124 ft (37.8 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNew Road
CrossesMill River
Location0.5 MI S of SR 453
RouteCity Street 0
Coordinates41.41412, -72.89548
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48.6 US tons
Inventory rating37.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length124 ft (37.8 m)
Longest span59 ft (18 m)
Deck width34 ft (10.4 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,125 (2023)
Projected traffic1,672 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was New Road over Mill River built?

It was built in 1935, making it 90 years old in 2025.

What condition is New Road over Mill River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does New Road over Mill River carry?

About 1,125 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is New Road over Mill River?

The structure is 124 ft (37.8 m) long with a longest span of 59 ft (18 m) and a deck 34 ft wide.

Who owns New Road over Mill River?

It is owned by the Town or Township Highway Agency.