Grand Avenue over Quinnipiac River
FairNew Haven County, Connecticut · 100 E of Front Street · Structure no. 03810
- Built
- 1900
- 125 years old, rebuilt 2022
- Condition
- Fair
- inspected August 2023
- Type
- Movable - Swing
- Steel
- Length
- 428 ft
- 2 main spans
- Daily traffic
- 2,400
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Grand Avenue over Quinnipiac River is a steel movable - swing carrying Grand Avenue over Quinnipiac River in New Haven County, Connecticut. It was built in 1900 and reconstructed in 2022, so it is 125 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,400 vehicles a day, roughly 8% of them trucks, projected to reach 3,566 by 2041. The structure is 428 ft (130.6 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grand Avenue over Quinnipiac River built?
It was built in 1900, making it 125 years old in 2025. It was reconstructed in 2022.
What condition is Grand Avenue over Quinnipiac River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Grand Avenue over Quinnipiac River carry?
About 2,400 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Grand Avenue over Quinnipiac River?
The structure is 428 ft (130.6 m) long with a longest span of 108 ft (32.9 m) and a deck 54 ft wide.
Who owns Grand Avenue over Quinnipiac River?
It is owned by the City or Municipal Highway Agency.