US Bridges

Route 8 Northbound over Porter Street

Fair

New Haven County, Connecticut · 1 MI South of I-84 Inter. · Structure no. 03184A

Built
1965
60 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
95 ft
1 main span
Daily traffic
25,300
2021 count
Owner
State
State Highway Agency

About this bridge

Route 8 Northbound over Porter Street is a steel stringer/multi-beam or girder carrying Route 8 Northbound over Porter Street in New Haven County, Connecticut. It was built in 1965, so it is 60 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,300 vehicles a day, roughly 6% of them trucks, projected to reach 37,593 by 2041. The structure is 95 ft (29 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 8 Northbound
CrossesPorter Street
Location1 MI South of I-84 Inter.
RouteState Highway 8
Coordinates41.54226, -73.04455
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93 US tons
Inventory rating56 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length95 ft (29 m)
Longest span90 ft (27.4 m)
Deck width44 ft (13.3 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,300 (2021)
Projected traffic37,593 by 2041
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 8 Northbound over Porter Street built?

It was built in 1965, making it 60 years old in 2025.

What condition is Route 8 Northbound over Porter Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Route 8 Northbound over Porter Street carry?

About 25,300 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is Route 8 Northbound over Porter Street?

The structure is 95 ft (29 m) long with a longest span of 90 ft (27.4 m) and a deck 44 ft wide.

Who owns Route 8 Northbound over Porter Street?

It is owned by the State Highway Agency.