US Bridges

Preston Avenue over Route 66

Fair

New Haven County, Connecticut · 0.6MI W JCT I-691 &rte 66 · Structure no. 03047

Built
1965
60 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
423 ft
4 main spans
Daily traffic
4,900
2022 count
Owner
State
State Highway Agency

About this bridge

Preston Avenue over Route 66 is a steel continuous stringer/multi-beam or girder carrying Preston Avenue over Route 66 in New Haven County, Connecticut. It was built in 1965, so it is 60 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,900 vehicles a day, roughly 4% of them trucks, projected to reach 7,281 by 2042. The structure is 423 ft (128.8 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPreston Avenue
CrossesRoute 66
Location0.6MI W JCT I-691 &rte 66
RouteCity Street 0
Coordinates41.53179, -72.75257
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length423 ft (128.8 m)
Longest span127 ft (38.7 m)
Deck width40 ft (12.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,900 (2022)
Projected traffic7,281 by 2042
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Preston Avenue over Route 66 built?

It was built in 1965, making it 60 years old in 2025.

What condition is Preston Avenue over Route 66 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Preston Avenue over Route 66 carry?

About 4,900 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Preston Avenue over Route 66?

The structure is 423 ft (128.8 m) long with a longest span of 127 ft (38.7 m) and a deck 40 ft wide.

Who owns Preston Avenue over Route 66?

It is owned by the State Highway Agency.