US Bridges

INTERSTATE-691 WB over Lewis Ave

Fair

New Haven County, Connecticut · At Exit 6 · Structure no. 02069

Built
1971
54 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
274 ft
4 main spans
Daily traffic
35,300
2021 count
Owner
State
State Highway Agency

About this bridge

INTERSTATE-691 WB over Lewis Ave is a steel stringer/multi-beam or girder carrying INTERSTATE-691 WB over Lewis Ave in New Haven County, Connecticut. It was built in 1971, so it is 54 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 35,300 vehicles a day, roughly 9% of them trucks, projected to reach 52,452 by 2041. The structure is 274 ft (83.5 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesINTERSTATE-691 WB
CrossesLewis Ave
LocationAt Exit 6
RouteInterstate 691
Coordinates41.54748, -72.80497
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating55.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length274 ft (83.5 m)
Longest span79 ft (24.1 m)
Deck width66 ft (20 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,300 (2021)
Projected traffic52,452 by 2041
Trucks9%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was INTERSTATE-691 WB over Lewis Ave built?

It was built in 1971, making it 54 years old in 2025.

What condition is INTERSTATE-691 WB over Lewis Ave in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does INTERSTATE-691 WB over Lewis Ave carry?

About 35,300 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is INTERSTATE-691 WB over Lewis Ave?

The structure is 274 ft (83.5 m) long with a longest span of 79 ft (24.1 m) and a deck 66 ft wide.

Who owns INTERSTATE-691 WB over Lewis Ave?

It is owned by the State Highway Agency.