Route 8 over SR 728 (derby Avenue)
FairNew Haven County, Connecticut · .1 MI N of Exit 21 RTE 8N · Structure no. 00585
- Built
- 1961
- 64 years old, rebuilt 1989
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 205 ft
- 3 main spans
- Daily traffic
- 53,800
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Route 8 over SR 728 (derby Avenue) is a steel continuous stringer/multi-beam or girder carrying Route 8 over SR 728 (derby Avenue) in New Haven County, Connecticut. It was built in 1961 and reconstructed in 1989, so it is 64 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 53,800 vehicles a day, roughly 9% of them trucks, projected to reach 79,941 by 2041. The structure is 205 ft (62.5 m) long and 84 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 8 over SR 728 (derby Avenue) built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1989.
What condition is Route 8 over SR 728 (derby Avenue) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Route 8 over SR 728 (derby Avenue) carry?
About 53,800 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is Route 8 over SR 728 (derby Avenue)?
The structure is 205 ft (62.5 m) long with a longest span of 88 ft (26.8 m) and a deck 84 ft wide.
Who owns Route 8 over SR 728 (derby Avenue)?
It is owned by the State Highway Agency.