US Bridges

Seymour Avenue over Route 8

Fair

New Haven County, Connecticut · 0.9 MI N of Route 34 · Structure no. 00576

Built
1952
73 years old, rebuilt 1991
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
135 ft
2 main spans
Daily traffic
5,700
2022 count
Owner
State
State Highway Agency

About this bridge

Seymour Avenue over Route 8 is a steel stringer/multi-beam or girder carrying Seymour Avenue over Route 8 in New Haven County, Connecticut. It was built in 1952 and reconstructed in 1991, so it is 73 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,700 vehicles a day, roughly 5% of them trucks, projected to reach 8,470 by 2042. The structure is 135 ft (41.1 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSeymour Avenue
CrossesRoute 8
Location0.9 MI N of Route 34
RouteCity Street 0
Coordinates41.33027, -73.08934
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating77.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length135 ft (41.1 m)
Longest span63 ft (19.2 m)
Deck width59 ft (17.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,700 (2022)
Projected traffic8,470 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Seymour Avenue over Route 8 built?

It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1991.

What condition is Seymour Avenue over Route 8 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Seymour Avenue over Route 8 carry?

About 5,700 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Seymour Avenue over Route 8?

The structure is 135 ft (41.1 m) long with a longest span of 63 ft (19.2 m) and a deck 59 ft wide.

Who owns Seymour Avenue over Route 8?

It is owned by the State Highway Agency.