I-95 SB Ramps M&p over East Street & P&w RR
GoodNew Haven County, Connecticut · At West End of Q-Bridge · Structure no. 00174E
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 843 ft
- 5 main spans
- Daily traffic
- 22,310
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I-95 SB Ramps M&p over East Street & P&w RR is a steel continuous stringer/multi-beam or girder carrying I-95 SB Ramps M&p over East Street & P&w RR in New Haven County, Connecticut. It was built in 2016, so it is 9 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,310 vehicles a day, roughly 9% of them trucks, projected to reach 33,150 by 2035. The structure is 843 ft (257 m) long and 78 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 SB Ramps M&p over East Street & P&w RR built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-95 SB Ramps M&p over East Street & P&w RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does I-95 SB Ramps M&p over East Street & P&w RR carry?
About 22,310 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is I-95 SB Ramps M&p over East Street & P&w RR?
The structure is 843 ft (257 m) long with a longest span of 198 ft (60.5 m) and a deck 78 ft wide.
Who owns I-95 SB Ramps M&p over East Street & P&w RR?
It is owned by the State Highway Agency.