US Bridges

Route 9 Southbound over Bartholomew Road

Good

Middlesex County, Connecticut · 0.6 MI S of Route 155 · Structure no. 02383

Built
1959
66 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
87 ft
1 main span
Daily traffic
22,900
2019 count
Owner
State
State Highway Agency

About this bridge

Route 9 Southbound over Bartholomew Road is a steel stringer/multi-beam or girder carrying Route 9 Southbound over Bartholomew Road in Middlesex County, Connecticut. It was built in 1959, so it is 66 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,900 vehicles a day, roughly 5% of them trucks, projected to reach 34,027 by 2039. The structure is 87 ft (26.5 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 9 Southbound
CrossesBartholomew Road
Location0.6 MI S of Route 155
RouteState Highway 9
Coordinates41.52737, -72.61285
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80 US tons
Inventory rating61.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length87 ft (26.5 m)
Longest span80 ft (24.4 m)
Deck width49 ft (14.8 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,900 (2019)
Projected traffic34,027 by 2039
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 9 Southbound over Bartholomew Road built?

It was built in 1959, making it 66 years old in 2025.

What condition is Route 9 Southbound over Bartholomew Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Route 9 Southbound over Bartholomew Road carry?

About 22,900 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Route 9 Southbound over Bartholomew Road?

The structure is 87 ft (26.5 m) long with a longest span of 80 ft (24.4 m) and a deck 49 ft wide.

Who owns Route 9 Southbound over Bartholomew Road?

It is owned by the State Highway Agency.