Route 8 Northbound over Naugatuck River & Access
FairLitchfield County, Connecticut · .66 MI North of US 6 · Structure no. 03357
- Built
- 1966
- 59 years old, rebuilt 1993
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 343 ft
- 3 main spans
- Daily traffic
- 11,800
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Route 8 Northbound over Naugatuck River & Access is a steel stringer/multi-beam or girder carrying Route 8 Northbound over Naugatuck River & Access in Litchfield County, Connecticut. It was built in 1966 and reconstructed in 1993, so it is 59 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,800 vehicles a day, roughly 5% of them trucks, projected to reach 17,534 by 2041. The structure is 343 ft (104.4 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 8 Northbound over Naugatuck River & Access built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1993.
What condition is Route 8 Northbound over Naugatuck River & Access in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Route 8 Northbound over Naugatuck River & Access carry?
About 11,800 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is Route 8 Northbound over Naugatuck River & Access?
The structure is 343 ft (104.4 m) long with a longest span of 111 ft (33.8 m) and a deck 44 ft wide.
Who owns Route 8 Northbound over Naugatuck River & Access?
It is owned by the State Highway Agency.