Litchfield County, Connecticut · At Exit 39 · Structure no. 03353

Built
1966
59 years old, rebuilt 1993
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
92 ft
1 main span
Daily traffic
9,300
2021 count
Owner
State
State Highway Agency

About this bridge

Route 8 Northbound over Route 222 - East Main ST is a steel stringer/multi-beam or girder carrying Route 8 Northbound over Route 222 - East Main ST in Litchfield County, Connecticut. It was built in 1966 and reconstructed in 1993, so it is 59 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,300 vehicles a day, roughly 5% of them trucks, projected to reach 13,819 by 2041. The structure is 92 ft (28 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 8 Northbound
CrossesRoute 222 - East Main ST
LocationAt Exit 39
RouteState Highway 8
Coordinates41.67422, -73.06568
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating55 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length92 ft (28 m)
Longest span87 ft (26.4 m)
Deck width44 ft (13.3 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,300 (2021)
Projected traffic13,819 by 2041
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 8 Northbound over Route 222 - East Main ST built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1993.

What condition is Route 8 Northbound over Route 222 - East Main ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Route 8 Northbound over Route 222 - East Main ST carry?

About 9,300 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Route 8 Northbound over Route 222 - East Main ST?

The structure is 92 ft (28 m) long with a longest span of 87 ft (26.4 m) and a deck 44 ft wide.

Who owns Route 8 Northbound over Route 222 - East Main ST?

It is owned by the State Highway Agency.