Route 9 Northbound over Route 175 (cedar Street)
FairHartford County, Connecticut · Route 9 Exit No. 38 · Structure no. 06104B
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 136 ft
- 1 main span
- Daily traffic
- 24,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Route 9 Northbound over Route 175 (cedar Street) is a steel stringer/multi-beam or girder carrying Route 9 Northbound over Route 175 (cedar Street) in Hartford County, Connecticut. It was built in 1991, so it is 34 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 24,000 vehicles a day, roughly 6% of them trucks, projected to reach 35,662 by 2042. The structure is 136 ft (41.5 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 9 Northbound over Route 175 (cedar Street) built?
It was built in 1991, making it 34 years old in 2025.
What condition is Route 9 Northbound over Route 175 (cedar Street) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Route 9 Northbound over Route 175 (cedar Street) carry?
About 24,000 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Route 9 Northbound over Route 175 (cedar Street)?
The structure is 136 ft (41.5 m) long with a longest span of 130 ft (39.6 m) and a deck 53 ft wide.
Who owns Route 9 Northbound over Route 175 (cedar Street)?
It is owned by the State Highway Agency.