US Bridges

Park Street over Cheney Rail Trail

Good

Hartford County, Connecticut · At Intersection W/ New ST · Structure no. 04401

Built
1941
84 years old, rebuilt 2008
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
118 ft
2 main spans
Daily traffic
1,887
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Park Street over Cheney Rail Trail is a steel continuous stringer/multi-beam or girder carrying Park Street over Cheney Rail Trail in Hartford County, Connecticut. It was built in 1941 and reconstructed in 2008, so it is 84 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,887 vehicles a day, roughly 2% of them trucks, projected to reach 2,804 by 2043. The structure is 118 ft (36 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPark Street
CrossesCheney Rail Trail
LocationAt Intersection W/ New ST
RouteCity Street 0
Coordinates41.76988, -72.529
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating50.7 US tons
Inventory rating38.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length118 ft (36 m)
Longest span56 ft (17.1 m)
Deck width41 ft (12.5 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,887 (2023)
Projected traffic2,804 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Park Street over Cheney Rail Trail built?

It was built in 1941, making it 84 years old in 2025. It was reconstructed in 2008.

What condition is Park Street over Cheney Rail Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Park Street over Cheney Rail Trail carry?

About 1,887 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is Park Street over Cheney Rail Trail?

The structure is 118 ft (36 m) long with a longest span of 56 ft (17.1 m) and a deck 41 ft wide.

Who owns Park Street over Cheney Rail Trail?

It is owned by the Town or Township Highway Agency.