New State Road over Hockanum River
FairHartford County, Connecticut · 0.5 MI North of RTE 6/44 · Structure no. 03677
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected January 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 63 ft
- 1 main span
- Daily traffic
- 5,300
- 2018 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
New State Road over Hockanum River is a prestressed concrete box beam or girders - multiple carrying New State Road over Hockanum River in Hartford County, Connecticut. It was built in 2004, so it is 21 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,300 vehicles a day, roughly 5% of them trucks, projected to reach 7,875 by 2038. The structure is 63 ft (19.2 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New State Road over Hockanum River built?
It was built in 2004, making it 21 years old in 2025.
What condition is New State Road over Hockanum River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does New State Road over Hockanum River carry?
About 5,300 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is New State Road over Hockanum River?
The structure is 63 ft (19.2 m) long with a longest span of 59 ft (18 m) and a deck 50 ft wide.
Who owns New State Road over Hockanum River?
It is owned by the Town or Township Highway Agency.