US Bridges

Route 72 Westbound over SR 555 (west Main St.)

Fair

Hartford County, Connecticut · 0.4 MI East of Route 372 · Structure no. 02912

Built
1973
52 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
134 ft
1 main span
Daily traffic
32,100
2022 count
Owner
State
State Highway Agency

About this bridge

Route 72 Westbound over SR 555 (west Main St.) is a steel stringer/multi-beam or girder carrying Route 72 Westbound over SR 555 (west Main St.) in Hartford County, Connecticut. It was built in 1973, so it is 52 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 32,100 vehicles a day, roughly 5% of them trucks, projected to reach 47,697 by 2042. The structure is 134 ft (40.8 m) long and 53 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesRoute 72 Westbound
CrossesSR 555 (west Main St.)
Location0.4 MI East of Route 372
RouteState Highway 72
Coordinates41.66536, -72.79816
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating71.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length134 ft (40.8 m)
Longest span124 ft (37.8 m)
Deck width53 ft (16.3 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic32,100 (2022)
Projected traffic47,697 by 2042
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 72 Westbound over SR 555 (west Main St.) built?

It was built in 1973, making it 52 years old in 2025.

What condition is Route 72 Westbound over SR 555 (west Main St.) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Route 72 Westbound over SR 555 (west Main St.) carry?

About 32,100 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Route 72 Westbound over SR 555 (west Main St.)?

The structure is 134 ft (40.8 m) long with a longest span of 124 ft (37.8 m) and a deck 53 ft wide.

Who owns Route 72 Westbound over SR 555 (west Main St.)?

It is owned by the State Highway Agency.