SR 500 TR 805 over Pitkin Street
FairHartford County, Connecticut · .1 Mile S of Governor ST · Structure no. 02371
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 61 ft
- 1 main span
- Daily traffic
- 3,900
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SR 500 TR 805 over Pitkin Street is a steel stringer/multi-beam or girder carrying SR 500 TR 805 over Pitkin Street in Hartford County, Connecticut. It was built in 1964, so it is 61 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,900 vehicles a day, roughly 14% of them trucks, projected to reach 5,795 by 2038. The structure is 61 ft (18.5 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 500 TR 805 over Pitkin Street built?
It was built in 1964, making it 61 years old in 2025.
What condition is SR 500 TR 805 over Pitkin Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does SR 500 TR 805 over Pitkin Street carry?
About 3,900 vehicles per day (2018 count), of which roughly 14% are trucks.
How long is SR 500 TR 805 over Pitkin Street?
The structure is 61 ft (18.5 m) long with a longest span of 56 ft (17.1 m) and a deck 44 ft wide.
Who owns SR 500 TR 805 over Pitkin Street?
It is owned by the State Highway Agency.