US Bridges

I-84 TR 826 over Connecticut River

Fair

Hartford County, Connecticut · Exit 51 I-84 WB to I-91NB · Structure no. 00980B

Built
1964
61 years old, rebuilt 2020
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
263 ft
2 main spans
Daily traffic
14,400
2022 count
Owner
State
State Highway Agency

About this bridge

I-84 TR 826 over Connecticut River is a steel stringer/multi-beam or girder carrying I-84 TR 826 over Connecticut River in Hartford County, Connecticut. It was built in 1964 and reconstructed in 2020, so it is 61 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,400 vehicles a day, roughly 14% of them trucks, projected to reach 21,397 by 2042. The structure is 263 ft (80.2 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-84 TR 826
CrossesConnecticut River
LocationExit 51 I-84 WB to I-91NB
RouteInterstate 84
Coordinates41.76984, -72.66751
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating53.9 US tons
Inventory rating41.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadHS 20
Structure length263 ft (80.2 m)
Longest span123 ft (37.5 m)
Deck width27 ft (8.1 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,400 (2022)
Projected traffic21,397 by 2042
Trucks14%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-84 TR 826 over Connecticut River built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2020.

What condition is I-84 TR 826 over Connecticut River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does I-84 TR 826 over Connecticut River carry?

About 14,400 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is I-84 TR 826 over Connecticut River?

The structure is 263 ft (80.2 m) long with a longest span of 123 ft (37.5 m) and a deck 27 ft wide.

Who owns I-84 TR 826 over Connecticut River?

It is owned by the State Highway Agency.