US Bridges

Garamella Blvd over Padanaram Brook

Fair

Fairfield County, Connecticut · 0.2 MI E of Route 53 · Structure no. 06184

Built
1986
39 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
10,405
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Garamella Blvd over Padanaram Brook is a concrete culvert carrying Garamella Blvd over Padanaram Brook in Fairfield County, Connecticut. It was built in 1986, so it is 39 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,405 vehicles a day, roughly 4% of them trucks, projected to reach 15,461 by 2044. The structure is 33 ft (10.1 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGaramella Blvd
CrossesPadanaram Brook
Location0.2 MI E of Route 53
RouteCity Street 0
Coordinates41.39949, -73.45498
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckOther
Main spans3
Design loadUnknown
Structure length33 ft (10.1 m)
Longest span10 ft (3 m)
Deck width56 ft (17.2 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,405 (2024)
Projected traffic15,461 by 2044
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Garamella Blvd over Padanaram Brook built?

It was built in 1986, making it 39 years old in 2025.

What condition is Garamella Blvd over Padanaram Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Garamella Blvd over Padanaram Brook carry?

About 10,405 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Garamella Blvd over Padanaram Brook?

The structure is 33 ft (10.1 m) long with a longest span of 10 ft (3 m) and a deck 56 ft wide.

Who owns Garamella Blvd over Padanaram Brook?

It is owned by the City or Municipal Highway Agency.