US Route 1 over Metro North Railroad
FairFairfield County, Connecticut · Near Exit 23 - Route 95 · Structure no. 05794
- Built
- 1938
- 87 years old, rebuilt 1989
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 152 ft
- 3 main spans
- Daily traffic
- 11,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US Route 1 over Metro North Railroad is a prestressed concrete stringer/multi-beam or girder carrying US Route 1 over Metro North Railroad in Fairfield County, Connecticut. It was built in 1938 and reconstructed in 1989, so it is 87 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,100 vehicles a day, roughly 9% of them trucks, projected to reach 16,493 by 2042. The structure is 152 ft (46.4 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US Route 1 over Metro North Railroad built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 1989.
What condition is US Route 1 over Metro North Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does US Route 1 over Metro North Railroad carry?
About 11,100 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is US Route 1 over Metro North Railroad?
The structure is 152 ft (46.4 m) long with a longest span of 67 ft (20.5 m) and a deck 58 ft wide.
Who owns US Route 1 over Metro North Railroad?
It is owned by the State Highway Agency.