Unquowa Road over Metro North Railroad
FairFairfield County, Connecticut · 0.1 MI N of US Route 1 · Structure no. 05788
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected December 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 234 ft
- 3 main spans
- Daily traffic
- 5,900
- 2020 count
- Owner
- Unknown
- Unknown
About this bridge
Unquowa Road over Metro North Railroad is a prestressed concrete box beam or girders - multiple carrying Unquowa Road over Metro North Railroad in Fairfield County, Connecticut. It was built in 1989, so it is 36 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,900 vehicles a day, roughly 6% of them trucks, projected to reach 8,767 by 2040. The structure is 234 ft (71.3 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Unquowa Road over Metro North Railroad built?
It was built in 1989, making it 36 years old in 2025.
What condition is Unquowa Road over Metro North Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2022.
How much traffic does Unquowa Road over Metro North Railroad carry?
About 5,900 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is Unquowa Road over Metro North Railroad?
The structure is 234 ft (71.3 m) long with a longest span of 76 ft (23.3 m) and a deck 48 ft wide.
Who owns Unquowa Road over Metro North Railroad?
It is owned by the Unknown and maintained by the State Highway Agency.