US Bridges

Portland Avenue over Norwalk River

Fair

Fairfield County, Connecticut · Branchville Station Lot · Structure no. 05510

Built
1928
97 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
27 ft
1 main span
Daily traffic
3,790
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Portland Avenue over Norwalk River is a steel stringer/multi-beam or girder carrying Portland Avenue over Norwalk River in Fairfield County, Connecticut. It was built in 1928, so it is 97 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,790 vehicles a day, roughly 4% of them trucks, projected to reach 5,632 by 2043. The structure is 27 ft (8.2 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPortland Avenue
CrossesNorwalk River
LocationBranchville Station Lot
RouteCity Street 0
Coordinates41.26552, -73.44079
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating31 US tons
Inventory rating24 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length27 ft (8.2 m)
Longest span23 ft (7 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,790 (2023)
Projected traffic5,632 by 2043
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.3 million (2018 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Portland Avenue over Norwalk River built?

It was built in 1928, making it 97 years old in 2025.

What condition is Portland Avenue over Norwalk River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Portland Avenue over Norwalk River carry?

About 3,790 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Portland Avenue over Norwalk River?

The structure is 27 ft (8.2 m) long with a longest span of 23 ft (7 m) and a deck 30 ft wide.

Who owns Portland Avenue over Norwalk River?

It is owned by the Town or Township Highway Agency.