Old Town Road over Pequonnock Rv & Trail
FairFairfield County, Connecticut · 150 Ft W of Route 127 · Structure no. 05402
- Built
- 1971
- 54 years old, rebuilt 2023
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 245 ft
- 2 main spans
- Daily traffic
- 15,050
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Old Town Road over Pequonnock Rv & Trail is a steel stringer/multi-beam or girder carrying Old Town Road over Pequonnock Rv & Trail in Fairfield County, Connecticut. It was built in 1971 and reconstructed in 2023, so it is 54 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,050 vehicles a day, roughly 5% of them trucks, projected to reach 22,363 by 2043. The structure is 245 ft (74.7 m) long and 53 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Old Town Road over Pequonnock Rv & Trail built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2023.
What condition is Old Town Road over Pequonnock Rv & Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Old Town Road over Pequonnock Rv & Trail carry?
About 15,050 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Old Town Road over Pequonnock Rv & Trail?
The structure is 245 ft (74.7 m) long with a longest span of 119 ft (36.3 m) and a deck 53 ft wide.
Who owns Old Town Road over Pequonnock Rv & Trail?
It is owned by the Town or Township Highway Agency.