US Bridges

Beachside Avenue over Metro North Railroad

Good

Fairfield County, Connecticut · 125 Ft S of I-95 · Structure no. 04357

Built
1982
43 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
118 ft
1 main span
Daily traffic
2,577
2024 count
Owner
Unknown
Unknown

About this bridge

Beachside Avenue over Metro North Railroad is a steel stringer/multi-beam or girder carrying Beachside Avenue over Metro North Railroad in Fairfield County, Connecticut. It was built in 1982, so it is 43 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,577 vehicles a day, roughly 4% of them trucks, projected to reach 3,829 by 2044. The structure is 118 ft (36 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBeachside Avenue
CrossesMetro North Railroad
Location125 Ft S of I-95
RouteCity Street 0
Coordinates41.12088, -73.31936
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating86.6 US tons
Inventory rating52 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length118 ft (36 m)
Longest span110 ft (33.5 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,577 (2024)
Projected traffic3,829 by 2044
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerUnknown
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Beachside Avenue over Metro North Railroad built?

It was built in 1982, making it 43 years old in 2025.

What condition is Beachside Avenue over Metro North Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Beachside Avenue over Metro North Railroad carry?

About 2,577 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Beachside Avenue over Metro North Railroad?

The structure is 118 ft (36 m) long with a longest span of 110 ft (33.5 m) and a deck 36 ft wide.

Who owns Beachside Avenue over Metro North Railroad?

It is owned by the Unknown and maintained by the State Highway Agency.