US Bridges

Route 8 Northbound over Lindley Street &parking

Fair

Fairfield County, Connecticut · 2.2 MI N of I-95 · Structure no. 03761

Built
1972
53 years old, rebuilt 2016
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
172 ft
2 main spans
Daily traffic
41,100
2021 count
Owner
State
State Highway Agency

About this bridge

Route 8 Northbound over Lindley Street &parking is a steel stringer/multi-beam or girder carrying Route 8 Northbound over Lindley Street &parking in Fairfield County, Connecticut. It was built in 1972 and reconstructed in 2016, so it is 53 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 41,100 vehicles a day, roughly 8% of them trucks, projected to reach 61,070 by 2041. The structure is 172 ft (52.5 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 8 Northbound
CrossesLindley Street &parking
Location2.2 MI N of I-95
RouteState Highway 8
Coordinates41.19722, -73.19447
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.3 US tons
Inventory rating57.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length172 ft (52.5 m)
Longest span81 ft (24.8 m)
Deck width72 ft (21.8 m)
Roadway width69 ft (21 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41,100 (2021)
Projected traffic61,070 by 2041
Trucks8%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 8 Northbound over Lindley Street &parking built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2016.

What condition is Route 8 Northbound over Lindley Street &parking in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Route 8 Northbound over Lindley Street &parking carry?

About 41,100 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is Route 8 Northbound over Lindley Street &parking?

The structure is 172 ft (52.5 m) long with a longest span of 81 ft (24.8 m) and a deck 72 ft wide.

Who owns Route 8 Northbound over Lindley Street &parking?

It is owned by the State Highway Agency.