US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1
FairFairfield County, Connecticut · INTERSTATE-95 Exit 15 · Structure no. 03562
- Built
- 1970
- 55 years old, rebuilt 1999
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 342 ft
- 2 main spans
- Daily traffic
- 36,700
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1 is a steel continuous stringer/multi-beam or girder carrying US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1 in Fairfield County, Connecticut. It was built in 1970 and reconstructed in 1999, so it is 55 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 36,700 vehicles a day, roughly 6% of them trucks, projected to reach 54,533 by 2040. The structure is 342 ft (104.2 m) long and 96 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1 built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1999.
What condition is US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1 carry?
About 36,700 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1?
The structure is 342 ft (104.2 m) long with a longest span of 168 ft (51.2 m) and a deck 96 ft wide.
Who owns US Route 7 & Ramp over I-95 & TR802 RTE 7 Rmp 1?
It is owned by the State Highway Agency.