US Bridges

Highland Avenue over Route 8

Fair

Fairfield County, Connecticut · 1.2 MI N of I-95 · Structure no. 03546

Built
1968
57 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
194 ft
2 main spans
Daily traffic
2,344
2023 count
Owner
State
State Highway Agency

About this bridge

Highland Avenue over Route 8 is a prestressed concrete stringer/multi-beam or girder carrying Highland Avenue over Route 8 in Fairfield County, Connecticut. It was built in 1968, so it is 57 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,344 vehicles a day, roughly 3% of them trucks, projected to reach 3,483 by 2043. The structure is 194 ft (59.1 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHighland Avenue
CrossesRoute 8
Location1.2 MI N of I-95
RouteCity Street 0
Coordinates41.18302, -73.19371
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.1 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length194 ft (59.1 m)
Longest span94 ft (28.7 m)
Deck width52 ft (16 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,344 (2023)
Projected traffic3,483 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Highland Avenue over Route 8 built?

It was built in 1968, making it 57 years old in 2025.

What condition is Highland Avenue over Route 8 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Highland Avenue over Route 8 carry?

About 2,344 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Highland Avenue over Route 8?

The structure is 194 ft (59.1 m) long with a longest span of 94 ft (28.7 m) and a deck 52 ft wide.

Who owns Highland Avenue over Route 8?

It is owned by the State Highway Agency.