INTERSTATE-84 EB over Dnby Term/Housatonic RR
FairFairfield County, Connecticut · O.5 MI West of US Route 7 · Structure no. 01182
- Built
- 1962
- 63 years old, rebuilt 1984
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 226 ft
- 3 main spans
- Daily traffic
- 41,200
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
INTERSTATE-84 EB over Dnby Term/Housatonic RR is a steel stringer/multi-beam or girder carrying INTERSTATE-84 EB over Dnby Term/Housatonic RR in Fairfield County, Connecticut. It was built in 1962 and reconstructed in 1984, so it is 63 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 41,200 vehicles a day, roughly 9% of them trucks, projected to reach 61,219 by 2041. The structure is 226 ft (68.8 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was INTERSTATE-84 EB over Dnby Term/Housatonic RR built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1984.
What condition is INTERSTATE-84 EB over Dnby Term/Housatonic RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does INTERSTATE-84 EB over Dnby Term/Housatonic RR carry?
About 41,200 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is INTERSTATE-84 EB over Dnby Term/Housatonic RR?
The structure is 226 ft (68.8 m) long with a longest span of 83 ft (25.3 m) and a deck 59 ft wide.
Who owns INTERSTATE-84 EB over Dnby Term/Housatonic RR?
It is owned by the State Highway Agency.