US Bridges

SH 59 Ml over Arikaree River

Fair

Yuma County, Colorado · 3.3 MI N of JCT US 36 (jo · Structure no. F-26-E

Built
1986
39 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
305 ft
3 main spans
Daily traffic
360
2020 count
Owner
State
State Highway Agency

About this bridge

SH 59 Ml over Arikaree River is a prestressed concrete continuous stringer/multi-beam or girder carrying SH 59 Ml over Arikaree River in Yuma County, Colorado. It was built in 1986, so it is 39 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 360 vehicles a day, roughly 31% of them trucks, projected to reach 464 by 2040. The structure is 305 ft (92.9 m) long and 36 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesSH 59 Ml
CrossesArikaree River
Location3.3 MI N of JCT US 36 (jo
RouteState Highway 59B
Coordinates39.70503, -102.70693
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating20.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length305 ft (92.9 m)
Longest span100 ft (30.4 m)
Deck width36 ft (11.1 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic360 (2020)
Projected traffic464 by 2040
Trucks31%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 59 Ml over Arikaree River built?

It was built in 1986, making it 39 years old in 2025.

What condition is SH 59 Ml over Arikaree River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does SH 59 Ml over Arikaree River carry?

About 360 vehicles per day (2020 count), of which roughly 31% are trucks.

How long is SH 59 Ml over Arikaree River?

The structure is 305 ft (92.9 m) long with a longest span of 100 ft (30.4 m) and a deck 36 ft wide.

Who owns SH 59 Ml over Arikaree River?

It is owned by the State Highway Agency.