County Road 54 over Big Thompson River
GoodWeld County, Colorado · 0.7 MI E of CO RD 13 · Structure no. WEL054.0_013.0A
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 343 ft
- 3 main spans
- Daily traffic
- 7,403
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 54 over Big Thompson River is a prestressed concrete continuous stringer/multi-beam or girder carrying County Road 54 over Big Thompson River in Weld County, Colorado. It was built in 2024, so it is 1 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,403 vehicles a day, roughly 13% of them trucks, projected to reach 10,512 by 2043. The structure is 343 ft (104.4 m) long and 71 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 54 over Big Thompson River built?
It was built in 2024, making it 1 years old in 2025.
What condition is County Road 54 over Big Thompson River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does County Road 54 over Big Thompson River carry?
About 7,403 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is County Road 54 over Big Thompson River?
The structure is 343 ft (104.4 m) long with a longest span of 115 ft (35.1 m) and a deck 71 ft wide.
Who owns County Road 54 over Big Thompson River?
It is owned by the County Highway Agency.