US Bridges

I 25 Ml over Gw RR

Fair

Weld County, Colorado · 0.6 MI So of JCT SH 60 · Structure no. C-17-FW

Built
2023
2 years old
Condition
Fair
inspected June 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
82 ft
3 main spans
Daily traffic
36,000
2020 count
Owner
State
State Highway Agency

About this bridge

I 25 Ml over Gw RR is a prestressed concrete box beam or girders - multiple carrying I 25 Ml over Gw RR in Weld County, Colorado. It was built in 2023, so it is 2 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 36,000 vehicles a day, roughly 10% of them trucks, projected to reach 52,200 by 2040. The structure is 82 ft (25.1 m) long and 77 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 25 Ml
CrossesGw RR
Location0.6 MI So of JCT SH 60
RouteInterstate 25A
Coordinates40.32809, -104.98028
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length82 ft (25.1 m)
Longest span27 ft (8.2 m)
Deck width77 ft (23.5 m)
Roadway width74 ft (22.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic36,000 (2020)
Projected traffic52,200 by 2040
Trucks10%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 25 Ml over Gw RR built?

It was built in 2023, making it 2 years old in 2025.

What condition is I 25 Ml over Gw RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does I 25 Ml over Gw RR carry?

About 36,000 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is I 25 Ml over Gw RR?

The structure is 82 ft (25.1 m) long with a longest span of 27 ft (8.2 m) and a deck 77 ft wide.

Who owns I 25 Ml over Gw RR?

It is owned by the State Highway Agency.