I 25 Service RD over Little Thompson River SR
GoodWeld County, Colorado · 6.7 MI No of JCT SH 56 · Structure no. C-17-FS
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 177 ft
- 3 main spans
- Daily traffic
- 2,400
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
I 25 Service RD over Little Thompson River SR is a prestressed concrete continuous box beam or girders - multiple carrying I 25 Service RD over Little Thompson River SR in Weld County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,400 vehicles a day, roughly 14% of them trucks, projected to reach 3,400 by 2031. The structure is 177 ft (53.8 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 25 Service RD over Little Thompson River SR built?
It was built in 2013, making it 12 years old in 2025.
What condition is I 25 Service RD over Little Thompson River SR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does I 25 Service RD over Little Thompson River SR carry?
About 2,400 vehicles per day (2011 count), of which roughly 14% are trucks.
How long is I 25 Service RD over Little Thompson River SR?
The structure is 177 ft (53.8 m) long with a longest span of 58 ft (17.7 m) and a deck 43 ft wide.
Who owns I 25 Service RD over Little Thompson River SR?
It is owned by the State Highway Agency.