SH 392 Ml over Greeley Canal No 2
GoodWeld County, Colorado · 4.2 MI E of JCT SH 257 · Structure no. C-17-BD
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 8,100
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 392 Ml over Greeley Canal No 2 is a prestressed concrete stringer/multi-beam or girder carrying SH 392 Ml over Greeley Canal No 2 in Weld County, Colorado. It was built in 2003, so it is 22 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,100 vehicles a day, roughly 9% of them trucks, projected to reach 11,583 by 2040. The structure is 50 ft (15.2 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 392 Ml over Greeley Canal No 2 built?
It was built in 2003, making it 22 years old in 2025.
What condition is SH 392 Ml over Greeley Canal No 2 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SH 392 Ml over Greeley Canal No 2 carry?
About 8,100 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is SH 392 Ml over Greeley Canal No 2?
The structure is 50 ft (15.2 m) long with a longest span of 47 ft (14.3 m) and a deck 43 ft wide.
Who owns SH 392 Ml over Greeley Canal No 2?
It is owned by the State Highway Agency.