US Bridges

US 85 Ml over UP RR

Good

Weld County, Colorado · 2.4 MI N of Nunn · Structure no. B-17-DF

Built
2013
12 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
395 ft
3 main spans
Daily traffic
4,600
2020 count
Owner
State
State Highway Agency

About this bridge

US 85 Ml over UP RR is a prestressed concrete continuous stringer/multi-beam or girder carrying US 85 Ml over UP RR in Weld County, Colorado. It was built in 2013, so it is 12 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,600 vehicles a day, roughly 17% of them trucks, projected to reach 6,348 by 2040. The structure is 395 ft (120.4 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS 85 Ml
CrossesUP RR
Location2.4 MI N of Nunn
RouteU.S. Route 85L
Coordinates40.73598, -104.79213
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.6 US tons
Inventory rating35.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length395 ft (120.4 m)
Longest span154 ft (46.9 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,600 (2020)
Projected traffic6,348 by 2040
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.4 million
NavigationNo navigation control on waterway

Frequently asked questions

When was US 85 Ml over UP RR built?

It was built in 2013, making it 12 years old in 2025.

What condition is US 85 Ml over UP RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does US 85 Ml over UP RR carry?

About 4,600 vehicles per day (2020 count), of which roughly 17% are trucks.

How long is US 85 Ml over UP RR?

The structure is 395 ft (120.4 m) long with a longest span of 154 ft (46.9 m) and a deck 43 ft wide.

Who owns US 85 Ml over UP RR?

It is owned by the State Highway Agency.