County Road Pp over Jack Creek
FairWashington County, Colorado · 0.3 Mi. N. of Co. Rd. 20 · Structure no. WTNPP-20.30-A
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 63 ft
- 1 main span
- Daily traffic
- 25
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road Pp over Jack Creek is a steel stringer/multi-beam or girder carrying County Road Pp over Jack Creek in Washington County, Colorado. It was built in 1995, so it is 30 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25 vehicles a day, roughly 67% of them trucks, projected to reach 31 by 2042. The structure is 63 ft (19.2 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road Pp over Jack Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is County Road Pp over Jack Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does County Road Pp over Jack Creek carry?
About 25 vehicles per day (2023 count), of which roughly 67% are trucks.
How long is County Road Pp over Jack Creek?
The structure is 63 ft (19.2 m) long with a longest span of 58 ft (17.6 m) and a deck 34 ft wide.
Who owns County Road Pp over Jack Creek?
It is owned by the County Highway Agency.