County Road 1 over Hay Creek
FairTeller County, Colorado · Just S of CR 11 · Structure no. TELL-03-0.03-01
- Built
- 1930
- 95 years old, rebuilt 2003
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 68 ft
- 3 main spans
- Daily traffic
- 2,901
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 1 over Hay Creek is a steel continuous stringer/multi-beam or girder carrying County Road 1 over Hay Creek in Teller County, Colorado. It was built in 1930 and reconstructed in 2003, so it is 95 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,901 vehicles a day, roughly 14% of them trucks, projected to reach 3,510 by 2040. The structure is 68 ft (20.8 m) long and 29 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 1 over Hay Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 2003.
What condition is County Road 1 over Hay Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does County Road 1 over Hay Creek carry?
About 2,901 vehicles per day (2020 count), of which roughly 14% are trucks.
How long is County Road 1 over Hay Creek?
The structure is 68 ft (20.8 m) long with a longest span of 21 ft (6.5 m) and a deck 29 ft wide.
Who owns County Road 1 over Hay Creek?
It is owned by the County Highway Agency.