City Street-Pine over San Miguel River
FairSan Miguel County, Colorado · 500 Ft S of SH145 · Structure no. TELLRD-PINE ST
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected June 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 148
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
City Street-Pine over San Miguel River is a prestressed concrete tee beam carrying City Street-Pine over San Miguel River in San Miguel County, Colorado. It was built in 1985, so it is 40 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 148 vehicles a day, projected to reach 168 by 2042. The structure is 47 ft (14.4 m) long and 30 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was City Street-Pine over San Miguel River built?
It was built in 1985, making it 40 years old in 2025.
What condition is City Street-Pine over San Miguel River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does City Street-Pine over San Miguel River carry?
About 148 vehicles per day (2022 count).
How long is City Street-Pine over San Miguel River?
The structure is 47 ft (14.4 m) long with a longest span of 45 ft (13.6 m) and a deck 30 ft wide.
Who owns City Street-Pine over San Miguel River?
It is owned by the Town or Township Highway Agency.