US Bridges

County Road 19Q over Spring Creek

Good

San Miguel County, Colorado · 4.3 MI S of SH 141 · Structure no. SMG19Q-4.7-12A

Built
1994
31 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
6
2022 count
Owner
County
County Highway Agency

About this bridge

County Road 19Q over Spring Creek is a prestressed concrete stringer/multi-beam or girder carrying County Road 19Q over Spring Creek in San Miguel County, Colorado. It was built in 1994, so it is 31 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6 vehicles a day, projected to reach 7 by 2042. The structure is 80 ft (24.4 m) long and 31 ft wide. If it were closed, the detour would be 75.2 mi (121 km).

CarriesCounty Road 19Q
CrossesSpring Creek
Location4.3 MI S of SH 141
RouteCounty Highway 0
Coordinates37.95492, -108.70417
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.7 US tons
Inventory rating46.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span75 ft (22.9 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6 (2022)
Projected traffic7 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed75.2 mi (121 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 19Q over Spring Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is County Road 19Q over Spring Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does County Road 19Q over Spring Creek carry?

About 6 vehicles per day (2022 count).

How long is County Road 19Q over Spring Creek?

The structure is 80 ft (24.4 m) long with a longest span of 75 ft (22.9 m) and a deck 31 ft wide.

Who owns County Road 19Q over Spring Creek?

It is owned by the County Highway Agency.