County Road 74 over Elkhead Creek
GoodRoutt County, Colorado · 2 MI E of County RD 76 · Structure no. 107007402.00964
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 48 ft
- 1 main span
- Daily traffic
- 5
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 74 over Elkhead Creek is a steel stringer/multi-beam or girder carrying County Road 74 over Elkhead Creek in Routt County, Colorado. It was built in 1997, so it is 28 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5 vehicles a day, roughly 23% of them trucks, projected to reach 6 by 2042. The structure is 48 ft (14.7 m) long and 15 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 74 over Elkhead Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is County Road 74 over Elkhead Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does County Road 74 over Elkhead Creek carry?
About 5 vehicles per day (2023 count), of which roughly 23% are trucks.
How long is County Road 74 over Elkhead Creek?
The structure is 48 ft (14.7 m) long with a longest span of 46 ft (14 m) and a deck 15 ft wide.
Who owns County Road 74 over Elkhead Creek?
It is owned by the County Highway Agency.