US Bridges

Newman Ave. over Bessemer Ditch

Good

Pueblo County, Colorado · Corner of Newman/Vail · Structure no. PUENWMN-0.0-VAL

Built
1970
55 years old
Condition
Good
inspected November 2024
Type
Tee Beam
Prestressed Concrete
Length
24 ft
1 main span
Daily traffic
1,030
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Newman Ave. over Bessemer Ditch is a prestressed concrete tee beam carrying Newman Ave. over Bessemer Ditch in Pueblo County, Colorado. It was built in 1970, so it is 55 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,030 vehicles a day, roughly 5% of them trucks, projected to reach 1,216 by 2041. The structure is 24 ft (7.4 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNewman Ave.
CrossesBessemer Ditch
LocationCorner of Newman/Vail
RouteCity Street 0
Coordinates38.26124, -104.64885
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length24 ft (7.4 m)
Longest span20 ft (6.2 m)
Deck width48 ft (14.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,030 (2021)
Projected traffic1,216 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Newman Ave. over Bessemer Ditch built?

It was built in 1970, making it 55 years old in 2025.

What condition is Newman Ave. over Bessemer Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Newman Ave. over Bessemer Ditch carry?

About 1,030 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is Newman Ave. over Bessemer Ditch?

The structure is 24 ft (7.4 m) long with a longest span of 20 ft (6.2 m) and a deck 48 ft wide.

Who owns Newman Ave. over Bessemer Ditch?

It is owned by the City or Municipal Highway Agency.