US Bridges

8th Street over Dry Creek

Fair

Pueblo County, Colorado · 0.1 MI W of Amarillo ST · Structure no. PUE8TH-0.2-UTIC

Built
1955
70 years old
Condition
Fair
inspected December 2024
Type
Tee Beam
Concrete
Length
94 ft
3 main spans
Daily traffic
984
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

8th Street over Dry Creek is a concrete tee beam carrying 8th Street over Dry Creek in Pueblo County, Colorado. It was built in 1955, so it is 70 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 984 vehicles a day, roughly 5% of them trucks, projected to reach 1,161 by 2041. The structure is 94 ft (28.5 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries8th Street
CrossesDry Creek
Location0.1 MI W of Amarillo ST
RouteCity Street 0
Coordinates38.27548, -104.56675
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating33.1 US tons
Inventory rating25.8 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckOther
Main spans3
Design loadH 20
Structure length94 ft (28.5 m)
Longest span30 ft (9.2 m)
Deck width34 ft (10.4 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic984 (2021)
Projected traffic1,161 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 8th Street over Dry Creek built?

It was built in 1955, making it 70 years old in 2025.

What condition is 8th Street over Dry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does 8th Street over Dry Creek carry?

About 984 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is 8th Street over Dry Creek?

The structure is 94 ft (28.5 m) long with a longest span of 30 ft (9.2 m) and a deck 34 ft wide.

Who owns 8th Street over Dry Creek?

It is owned by the City or Municipal Highway Agency.