W. 11th Street over Dry Creek
GoodPueblo County, Colorado · 0.2 MI E of Adee Ave · Structure no. PUE11TH-02-ADEA
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 314 ft
- 3 main spans
- Daily traffic
- 709
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W. 11th Street over Dry Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying W. 11th Street over Dry Creek in Pueblo County, Colorado. It was built in 2017, so it is 8 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 709 vehicles a day, roughly 4% of them trucks, projected to reach 837 by 2041. The structure is 314 ft (95.7 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W. 11th Street over Dry Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is W. 11th Street over Dry Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does W. 11th Street over Dry Creek carry?
About 709 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is W. 11th Street over Dry Creek?
The structure is 314 ft (95.7 m) long with a longest span of 109 ft (33.3 m) and a deck 44 ft wide.
Who owns W. 11th Street over Dry Creek?
It is owned by the City or Municipal Highway Agency.