County Road 3 over Chico Creek
FairPueblo County, Colorado · 10.3 MI NE of HWY 50 · Structure no. PUCO 8.00-801B
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 330 ft
- 4 main spans
- Daily traffic
- 1,492
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 3 over Chico Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying County Road 3 over Chico Creek in Pueblo County, Colorado. It was built in 1975, so it is 50 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,492 vehicles a day, roughly 5% of them trucks, projected to reach 1,761 by 2041. The structure is 330 ft (100.6 m) long and 40 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 3 over Chico Creek built?
It was built in 1975, making it 50 years old in 2025.
What condition is County Road 3 over Chico Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does County Road 3 over Chico Creek carry?
About 1,492 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is County Road 3 over Chico Creek?
The structure is 330 ft (100.6 m) long with a longest span of 76 ft (23.2 m) and a deck 40 ft wide.
Who owns County Road 3 over Chico Creek?
It is owned by the County Highway Agency.