Pinon Road over Fountain Creek
FairPueblo County, Colorado · 2 MI NE Exit 110 I-25 · Structure no. PUCO 0.51-110B
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 817 ft
- 6 main spans
- Daily traffic
- 217
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Pinon Road over Fountain Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Pinon Road over Fountain Creek in Pueblo County, Colorado. It was built in 2004, so it is 21 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 217 vehicles a day, roughly 2% of them trucks, projected to reach 256 by 2042. The structure is 817 ft (248.9 m) long and 43 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pinon Road over Fountain Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is Pinon Road over Fountain Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Pinon Road over Fountain Creek carry?
About 217 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Pinon Road over Fountain Creek?
The structure is 817 ft (248.9 m) long with a longest span of 132 ft (40.2 m) and a deck 43 ft wide.
Who owns Pinon Road over Fountain Creek?
It is owned by the County Highway Agency.