- Built
- 1987
- 38 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 168 ft
- 2 main spans
- Daily traffic
- 225
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CR 342/CEDARWOODRD over Greenhorn Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying CR 342/CEDARWOODRD over Greenhorn Creek in Pueblo County, Colorado. It was built in 1987, so it is 38 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 225 vehicles a day, roughly 2% of them trucks, projected to reach 265 by 2042. The structure is 168 ft (51.2 m) long and 31 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 342/CEDARWOODRD over Greenhorn Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is CR 342/CEDARWOODRD over Greenhorn Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does CR 342/CEDARWOODRD over Greenhorn Creek carry?
About 225 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is CR 342/CEDARWOODRD over Greenhorn Creek?
The structure is 168 ft (51.2 m) long with a longest span of 81 ft (24.7 m) and a deck 31 ft wide.
Who owns CR 342/CEDARWOODRD over Greenhorn Creek?
It is owned by the County Highway Agency.