US Bridges

US 50 Ml over Rocky Fd. Highline Canal

Fair

Pueblo County, Colorado · 6 MI W. of Fowler · Structure no. L-20-B

Built
1932
93 years old, rebuilt 1948
Condition
Fair
inspected January 2024
Type
Arch - Deck
Concrete
Length
80 ft
1 main span
Daily traffic
4,200
2020 count
Owner
State
State Highway Agency

About this bridge

US 50 Ml over Rocky Fd. Highline Canal is a concrete arch - deck carrying US 50 Ml over Rocky Fd. Highline Canal in Pueblo County, Colorado. It was built in 1932 and reconstructed in 1948, so it is 93 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,200 vehicles a day, roughly 12% of them trucks, projected to reach 4,494 by 2040. The structure is 80 ft (24.4 m) long and 34 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesUS 50 Ml
CrossesRocky Fd. Highline Canal
Location6 MI W. of Fowler
RouteU.S. Route 50B
Coordinates38.16365, -104.12559
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40 US tons
Inventory rating36 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadH 15
Structure length80 ft (24.4 m)
Longest span65 ft (19.8 m)
Deck width34 ft (10.4 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,200 (2020)
Projected traffic4,494 by 2040
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusEligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 50 Ml over Rocky Fd. Highline Canal built?

It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1948.

What condition is US 50 Ml over Rocky Fd. Highline Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does US 50 Ml over Rocky Fd. Highline Canal carry?

About 4,200 vehicles per day (2020 count), of which roughly 12% are trucks.

How long is US 50 Ml over Rocky Fd. Highline Canal?

The structure is 80 ft (24.4 m) long with a longest span of 65 ft (19.8 m) and a deck 34 ft wide.

Who owns US 50 Ml over Rocky Fd. Highline Canal?

It is owned by the State Highway Agency.