US Bridges

US 50 Ml over Dry Creek

Good

Pueblo County, Colorado · 0.6 MI E of JCT SH 45 · Structure no. K-18-DA

Built
2018
7 years old
Condition
Good
inspected February 2025
Type
Tee Beam
Prestressed Concrete Continuous
Length
187 ft
3 main spans
Daily traffic
43,000
2020 count
Owner
State
State Highway Agency

About this bridge

US 50 Ml over Dry Creek is a prestressed concrete continuous tee beam carrying US 50 Ml over Dry Creek in Pueblo County, Colorado. It was built in 2018, so it is 7 years old, younger than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 43,000 vehicles a day, roughly 5% of them trucks, projected to reach 57,190 by 2040. The structure is 187 ft (57 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS 50 Ml
CrossesDry Creek
Location0.6 MI E of JCT SH 45
RouteU.S. Route 50A
Coordinates38.31302, -104.65277
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating50 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length187 ft (57 m)
Longest span71 ft (21.5 m)
Deck width63 ft (19.2 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic43,000 (2020)
Projected traffic57,190 by 2040
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost$3.1 million
NavigationNo navigation control on waterway

Frequently asked questions

When was US 50 Ml over Dry Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is US 50 Ml over Dry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does US 50 Ml over Dry Creek carry?

About 43,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is US 50 Ml over Dry Creek?

The structure is 187 ft (57 m) long with a longest span of 71 ft (21.5 m) and a deck 63 ft wide.

Who owns US 50 Ml over Dry Creek?

It is owned by the State Highway Agency.